Friday, June 6, 2014

Update 8: A Dynamic Duo

This Monday, we were only able to have rehearsal with two of our four actors, Kelly and Joe. This turned out to be both a good thing and a bad thing, as we weren't able to work with the other two, but Kelly and Joe seemed very prepared and were able to get a lot done. We were back at the lower school with just Gary playing the piano and Kelly and Joe had their kids again. However, this wasn't really a problem since husband and wife would take turns distracting the boys outside of the Chapel which meant that they both got to rehearse their songs (sometimes profane) as well as spend time with their kids. I don't know why we didn't think of doing that earlier since we usually have at least three cast members, it'd be easy for the cast (who are mostly good friends -- comfortable with leaving their children in their care for a few minutes) to switch off diverting the two boys.

Because of the nature of our project, our last day is not Wednesday, but actually next Monday. The plan for the next few days is to rehearse on Friday night, add tech on Saturday afternoon, and after that, we have to let everything go on Monday, regardless of any issues that may have arisen over the last few weeks.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.